Cunningham Tract

Phases 2, 3, and 4 Houston, TX

Previous
Next

Costello provided design and construction phase services for the reconstruction of 16 asphalt streets in the Cloverleaf subdivision in eastern Harris County.

The area is a mature residential area with existing asphalt streets and roadside ditch drainage systems. There are scattered commercial development establishments within the area. The roadways were duplicated with respect to asphalt paving widths, elevations, and materials. Those streets include Frankie Blvd., Beacon St., Cloverleaf, Nancy Rose Blvd., Manor St., Nimitz St., Muscatine St., McNair, and Garber Lane. The improvements for each identifi ed street included:

Relevant Project Services

Project Size & Cost

Challenges Faced

Resolutions & Results

The stabilization of base materials, application of the asphalt concrete surface, and shoulder dress up was performed.

The stabilization of base materials, application of the asphalt concrete surface, and shoulder dress up was performed.

Standard Harris County Stormwater Pollution Plan specifi cations and details were utilized to manage construction activities.

This project was fi nanced with GLO disaster relief funding. Joshua Netardus, P.E. served as Project Manager.

Related Projects

All
Planning Services
Master Planning
Land Planning
Park Services
Government Process
Landscape Architecture
The Highlands, Montgomery County
Copper Bend, Harris County
Brays Bayou, Harris County
Trails at Woodhaven Lakes, City of LA Marque, Galveston County
Windrow, Harris County, Texas
Sun Chase, Austin, Texas
Katy Legacy Houston, Harris County, Texas
Deerbrooke Phase 2, Williamson County
Bryan Crossing, Rosenberg, Texas
Aurora, Harris County, Texas